A first order closed at 14,800 USD with 30 percent down and the balance released on a photograph of packed cartons. When the cartons arrived, one third of the pieces had a plating defect that a photograph could not show. The buyer had already released the money, and the only remaining leverage was a goodwill conversation.

Payment structure is not an administrative detail. It decides which party holds leverage at each stage, and leverage is what converts a defect into a remedy.
What each payment stage should buy
A three-stage structure is standard in jewelry manufacturing, and each stage should correspond to a physical milestone rather than a calendar date.
| Stage | Typical share | What it funds | Trigger |
|---|---|---|---|
| Deposit | 30% | Metal and stone buying, production slot | Signed PO and approved sample |
| Pre-shipment balance | 60-70% | Labour, finishing, packing | Passed inspection with photo evidence |
| Retention | 0-10% | Post-delivery defect cover | Thirty days after receipt |
The important part is the trigger column. A balance released on a packing photo buys confidence, not evidence. A balance released after an inspection report with piece-level photographs buys evidence.
Why the deposit percentage matters less than the trigger
Buyers argue about 20 versus 30 percent. The size of the deposit rarely changes the outcome, because a deposit is refundable in principle and disputed in practice. What changes the outcome is whether the balance is released against a documented inspection.
Negotiate the inspection step before you negotiate the percentage. A supplier that accepts a piece-level inspection and a pre-shipment hold is a supplier worth a 30 percent deposit.
Method risk compared
Each payment method carries a different recovery path when something goes wrong. The table below is the practical comparison for wholesale order sizes.
| Method | Cost to buyer | Recovery if disputed | Best used for |
|---|---|---|---|
| T/T bank transfer | Low, 15-40 USD per transfer | Slow, but fully documented | First orders and large balances |
| PayPal | 3-4% plus conversion | Fast within the dispute window | Samples and orders under 3,000 USD |
| Western Union | Moderate | Very limited once collected | Small sample payments only |
| Letter of credit | High, bank fees | Strong if documents comply | Orders above 50,000 USD |
For most first orders between 3,000 and 20,000 USD, T/T is the right instrument because the bank record and the proforma invoice create a paper trail that survives a dispute. PayPal is convenient for samples, where the amount is small enough that speed matters more than cost.
Verify the bank details out of band
Payment redirection fraud is the single most expensive risk in this category. A compromised email account sends a revised invoice with new bank details, and the buyer pays a stranger.
Verify account details once, through a second channel, at the start of the relationship, and treat any later change as a red flag that requires verbal confirmation with a known contact. This single habit prevents most losses in wholesale purchasing.
The two clauses that make a claim enforceable
A claim needs a window and a standard of evidence. Without both, a defect becomes an opinion.
Clause one: the inspection window
State a fixed window measured from delivery, not from shipment. Thirty days is workable for volume orders; fourteen days is common for samples and small lots. Say explicitly what happens after the window closes.
Clause two: the evidence standard
Name the evidence: piece-level photographs with the SKU and piece number visible, plus a count of affected units and a description against the agreed tolerance. A claim supported this way can be settled in one exchange rather than five.
Add the default remedy. Replacement is usually the cleanest for a manufacturing defect; credit is cleaner for a cosmetic variance that the buyer can still sell. Rework is only practical before shipment.
How much commercial risk sits in each stage
A useful way to think about the structure is who is exposed at each point.
- Before deposit: the supplier carries material and slot risk, so the deposit exists
- Between deposit and inspection: the buyer carries the most risk, which is why inspection matters
- Between inspection and balance: the supplier carries risk, because the lot is finished and immovable
- After delivery: the buyer carries the defect risk unless a retention or claim window exists
A well-built structure puts the heaviest inspection at the point where the buyer's exposure peaks, and that point is always just before the balance release.
Retentions on large orders
Above roughly 20,000 USD, a 5 to 10 percent retention held for thirty days is a reasonable request. Expect the supplier to price it in, usually as a fraction of a percent on the unit price. That cost is smaller than the cost of discovering a systemic defect after full payment.
Currency, fees and the real landed cost
A quote in USD settled through a bank is not the cost you pay. Between the proforma invoice and the cleared payment sit three charges that belong in your margin model.
Transfer and conversion fees
An outgoing international transfer typically costs 15 to 40 USD plus any intermediary bank charge, and the receiving side may deduct another fee. On a 4,000 USD sample order that is under 2 percent; on a 60,000 USD order it is negligible. Budget it as a fixed cost, not a percentage.
Payment timing against production
If the balance is called on a Friday and the funds clear on Tuesday, the shipment schedule moves by two working days. On a tight seasonal window that matters. Ask whether the balance trigger is the inspection report or the shipped document, and plan the transfer around the slower of the two.
Incoterm and duty
Payment terms and delivery terms are separate clauses that get confused. A 30 percent deposit under FOB leaves the export clearance with the supplier and the import duty with you. Under DDP the supplier carries duty, and the unit price reflects it. Decide which one your landed-cost sheet assumes before the PO is signed.
Dispute escalation that actually works
Most payment disputes are avoidable if the escalation path is written into the order rather than discovered during one.
- Raise the defect in writing within the claim window, with piece-level photographs and a count
- State the remedy requested, not the emotion felt: replacement, credit, or a rework plan
- Escalate to the signatory on the proforma invoice after five working days without a substantive answer
- Hold any unreleased balance only if the claim concerns the lot that balance covers
- Close the claim in writing, with the agreed remedy and the date, so the next order starts clean
Withholding a balance on a new order because of an old dispute is the fastest way to lose a good supplier. Keep claims tied to the lot they concern.
One practical refinement: name a single claims contact on both sides and route everything through it. Group threads, chat messages and copied colleagues produce three versions of the same complaint and no decision. A named contact with authority to approve a replacement is worth more than a longer contract.
What our terms are and why
We work on a 30 percent deposit with the balance before shipment, settled by T/T, PayPal or Western Union. Samples are paid in full, because a ten to fifty piece run is too small to carry a balance cycle and the sample exists to be a decision input rather than inventory.
Minimum order is 50 pieces per design, negotiable when an order mixes styles. Stock-supported samples ship in three to five days, bulk in fifteen to twenty days under 500 pieces, and custom work runs about twenty days for a sample plus twenty-five to thirty days for the following lot.
On inspection we provide piece-level photographs for any lot above 200 pieces before the balance is called, and a defect record for anything reworked. That record is the buyer's evidence base if a later claim is needed.
Frequently Asked Questions
Should I pay a deposit before seeing a sample?
No. Approve the sample first, then pay the deposit against that approved specification. A deposit paid before approval funds a guess.
Is it normal for a supplier to ask for full payment on small orders?
Yes below roughly 1,500 USD, where the transaction cost of splitting the payment exceeds the risk it covers. Above that, a split is reasonable to request.
What if I need to change the order after the deposit is paid?
Changes before material cutting are usually absorbed. Changes after casting affect yield and cost, and most suppliers will re-quote the affected styles rather than the whole order. Agree the change window in the PO.
Can payment terms improve with repeat orders?
Yes. After two or three clean cycles, a supplier may accept 20 percent down or a thirty-day balance against a shipping document. Ask after a clean lot, not after a disputed one.
Next step
Request a proforma invoice with the payment stages, the inspection trigger and the claim window written into it. You can start with our order desk, and the guide index covers the specification side of the same order.